Page tree
Skip to end of metadata
Go to start of metadata

The first three tasks for installing and operating the Sangoma SBC are

  • Unpack
  • Inspect
  • Power up.

 

Carefully inspect the Sangoma SBC Appliance for any damage that might have occurred in shipment.

If damage is suspected, file a claim immediately with the carrier, keep the original packaging for damage verification and/or returning the unit, and contact Sangoma Customer Service.

What is included in the box

  • Sangoma SBC Appliance
    • Appliancecan be 1U or 2U depending on model ordered
  • Power Cable
    • AC cable in case of AC PSU (black cable)
    • DC cable in case of DC PSU (RED & Black cable)
  • Mounting Brackets
  • Rack mount rails
  • Quickstart user guide

Factory Configuration

  • No labels